The scope of work consisted of designing of complete ESP system along with equipment specifications from downhole to surface including ESP pump system, cable, surface set-up and energy requirements. The work included not only designing but equipment selection, technical scope of work preparation, technical; evaluation of bids from suppliers and finally technical recommendations. Project was successfully delivered in September 2018
Early 2018, another sub-contracting task was awarded to GOTS for an onshore Indian operator. Scope was to design artificial lift systems for low producing fields . On the basis of field data and past history optimum artificial lift selection was done and for 5 different fields different Artificial lift methods were opted (SRP system, Progressive Cavity pump and Jet pumps). The work included not only designing but equipment selection, technical scope of work preparation, technical; evaluation of bids from suppliers and finally technical recommendations. Project was successfully delivered in May 2018
Early 2017, GOTS was provided sub-contracting for an onshore Sucker rod pumping design system along with support in tendering process. The scope included designing of sucker rod pump designing, surface unit selection and surface facilities recommendation. Further, equipment selection process was done in conjunction with various vendors and multi-disciplinary client team to ensure a full development cycle of designing, selection and procurement. Designing of SRP included rod designing, downhole pump optimizations and surface pumping unit selection. Project was successfully delivered in August 2017